Supply and install new bathtub and new vanity in basement bathroom. Complete renovation of 2 kitchens. One on main floors and one in basement, applied two coats of finished Paint in living room. Flooring and install baseboards, while supplying and install new garage side door and replaced floor in all bedrooms. Tiling in main bath with new tiles, and installations to install new bathtub, windows in the living room, patio door 6 windows upstairs and all other specified areas.
Completed all electrical work required, remove old floors, old cabinets, and old doors. Cleaned up all debris and loose construction waste and the removal of 4 bins of debris from property.
Basement: | Kitchen |
Living room: | Family Room |
Lower level: | Garage Side Door |
Laundry room: | Stairs, Railing & Steps |
All bedroom floors: | Main Bathroom |
Master Bedroom: | Master En suite |
Windows: | Garage |
Electrical: | Demolition |